Governor’s Island Infrastructure Development

Kendall McCaugherty © Hall+Merrick Photographers and HED

Project Overview

Governor’s Island Infrastructure Development, New York, New York

Syska performed an evaluation of and report on the existing electrical infrastructure at Governors Island. The study’s primary focus was the medium (5 kV) and high (27kV) voltage equipment. Our study included meeting with Con Edison and the designated contractors.

At the conclusion of the study, Syska developed a prioritized list of electrical infrastructure projects with associated costs. The upgrades were prioritized with the highest being safety, followed by reliability, and lastly, capacity.

In addition, we conducted a preventative maintenance program for the switchgears and circuit breakers, existing 5kV gas filled selector switches, and all of the transformers located throughout the island.

Syska is presently working on upgrading the poor medium voltage and 480v distribution infrastructure throughout the island. The upgrades will include replacement of defective switchgear, transformers, feeders and further high-voltage repairs.

Size
4,500,000 sf

Completion Date
Ongoing

MEP Icon

Fire Protection

Sustainability

Sustainability

Vertical Transportation

Vertical Transportation

Architectural Lighting

Architectural Lighting

Fire & Life Safety

Fire & Life Safety

Commissioning

Commissioning

Information and Communication Technology Icon

ICT

Latest Insights

Governor’s Island Infrastructure Development

Governor’s Island Infrastructure Development